入冬后的海特林SERBOT清洗机擦楼
入冬后的清洗机擦楼,北方海边城市,风力6级别,幕墙钢构外凸100毫米,楼体高度110米,地面最高气温20度,平均清洗速度220平方米/小时,物业从内部看对清洗效果满意。
High-rise curtain wall cleaning machine
1. Workflow
1.1 The roof engineer arranges a spider man to fix the rope on the roof. According to the situation of the window at the proofing site, first lay down the main rope, fix it on the tree downstairs, and then lay down two auxiliary ropes in turn. When laying down, pay attention to the distance from the main rope to avoid wind deviation and entanglement with the main rope. After laying down, temporarily fix it below without too much force.
Adjust the distance between the two auxiliary ropes and the main rope. The specific limit hook of the company's equipment is 1200mm.
1.2 Hang the rope crawler and hook on the lower main rope, pull up the water jet washer, put the hooks on both sides of the auxiliary rope, after two people pull the auxiliary rope, one person pulls the remote rope crawler of the main rope up to the ground floor window, and fix the two auxiliary ropes on the lower three claw suction cup. The position of the auxiliary rope is determined according to the main rope.
1.3 Start the water pump by remote control, pull the equipment up to the height where it needs to be scrubbed, and then start the roller brush. Pay attention to that the water pump runs all the time and moves down slowly, especially when passing through the obstacles between windows. When falling to the bottom of the glass, stop the roller brush and water pump. Two people below untie the suction cup fixed rope cable external pulling equipment, and one person pulls the main rope to remotely lower the equipment.
1.4 According to the steps of the water jet cleaner, hang up the dry cleaner, clean from the bottom of the glass to the climbing height of the water jet cleaner, and then drop it. The work is over.